Design, supply and provided stamped engineered drawings for a 2 bar system. Prepare and powder coat over 1000 clamps, 500 brackets and 136 ten foot pipes to match original roof colour.
Design, supply and provided stamped engineered drawings for a 2 bar system. Prepare and powder coat over 1000 clamps, 500 brackets and 136 ten foot pipes to match original roof colour.